Programming Dosing Pump

kwelch02

New member
Mar 12, 2026
2
0
1
I have new a 4 dosing pump. I cant get the programming right. I find the instructions a little limited in detail. If I want each doser to work on specific days, rather than every day, what do I select?
 
I have new a 4 dosing pump. I cant get the programming right. I find the instructions a little limited in detail. If I want each doser to work on specific days, rather than every day, what do I select?

Hallo

Zeitplan aktivieren und unter "Wiederholung" die Wochentage auswählen wann gedüngt werden soll. Gilt dann für jeden Kanal (Pumpe)
 
Top